| Facility Condition Assessment (FCA): |
Planned implementation (FCA): |
|
|
- Improve air circulation at boys & girls locker rooms, increase combustion air at boiler rooms
|
- Electrical branch wiring improvements
|
- Add surge protection where needed and replace fire alarm devices
|
- Clock, fire alarm, and intercom systems improvements
|
- Replace master clock and make improvements to public address system
|
- Interior finishes upgraded (i.e. ceiling tiles, carpet, wall finishes, etc.)
|
- Selected Improvements in renovation work plus sound control in commons area
|
- Roof replacement and repairs
|
- Selected Improvements in renovation work
|
- Restroom renovations including ADA accessibility where required
|
- Selected Improvements in renovation work
|
- Site irrigation system improvements
|
- Under MUOF portion, replace 50% of irrigation system
|
|
|
- New interior signage for rooms, alternate
|
- Site paving replacement and repair
|
- Site paving replacement and repair in new construction
|
|
|
- Exterior wall repair in new construction
|
| |
|
| Program Compatibility Assessment (PCA): |
Planned implementation (PCA): |
- Provide an applied technology lab facility
|
- Add 5400 sf 2-story building, renovate rooms 112,113,114 of DaVinci Program
|
- Provide additional Special Education classrooms and offices
|
- Renovate teachers offices, Remodel Multi-Intensive, SIED & SPED classrooms
|
- Renovate and expand the art facilities
|
- Remodel 5200 sf 2-D & 3-D Art rooms
|
- Expand and renovate the administrative and counseling offices
|
- Add 860sf & Remodel 3050 sf at Administration area
|
| |
|
| Multi-Use Outdoor Facilities (MUOF): |
Planned implementation (MUOF): |
- Provide a home and visiting team field house
|
- Construction Drawings complete.
|
- Provide six tennis courts
|
- An all weather walk path is going to extend from the parking lot to the tennis courts at the South end of the campus. The existing tennis courts are to be resurfaced and three new courts are to be added adjacent to the existing courts.
|
- Bleacher area improvements to paving and drainage
|
- The drainage is to be improved at the Northwest end of the football stadium to reduce ponding in the area.
|
- Resurface the running track
|
- The existing running track is to be resurfaced. Bid documents issued. Bids due February 5, 2008.
|
| Information Technology (IT): |
Planned implementation (IT): |
- Upgrade WAN to provide capacity to support applications with high bandwidth demands
|
- Extend WAN to building, upgrade head end equipment.
|
- Upgrade LANs to provide reliable and responsive access to data, research, and information
|
- Upgrade existing LAN distribution.
|
- Implement VoIP to enhance communications capabilities and reduce cost
|
- Install new VoIP telecommunications systems.
|